Tongchuan Wangyi District People's Court Wang Yixiang People's Court Construction Project Construction Supervision Prequalification Announcement

Tongchuan Wangyi District People's Court Wang Yixiang People's Court Construction Project Construction Supervision Prequalification Announcement

1. Bidding conditions

The Construction Supervision of the People’s Court Construction Project of the Wang Yi District People’s Court of Tongchuan City was approved by the Wang Yi District Development and Reform Commission of Tongchuan City with Tongwangfafa [2017] No. 9 document. The construction fund was financed by funds and the tenderer was Tongchuan Wangyi District People's Court. The project already has the tendering conditions. The project construction supervision of the project is now open for public bidding.

2. Project Overview

2.1 The project's project content is: in accordance with the standards of the second class of people's courts, a three-tiered framework structure with a total construction area of ​​1023.51m2, a trial court, a mediation room, a filing room, a collegiate room, an enforcement store, and a trial auxiliary room. The address is located in Wangyi District, Tongchuan City.

2.2 Division of tenders: The tender for this supervision shall have a bid section.

3, applicant qualification requirements

3.1 Qualifications and requirements of applicants for bids: Must have an independent legal personality, possessing Class B qualifications for housing construction supervision. The project director must have the qualification of a national registered supervision engineer. The project director has no projects under construction and has corresponding experience.



4, prequalification methods

This prequalification uses a limited quantity system.

5. Acquisition of prequalification documents

5.1 The applicant is requested to apply from March 16, 2017 to March 22, 2017, daily from 9:00 to 11:30 and from 14:30 to 17:00.

5.2 Pre-qualification documents are priced at RMB 500 each and will not be refunded after sale.

Water Turbine

Turbines consist of runners, turbine boxes, nozzle assemblies, inlet pipes, deflectors and more. The runner is assembled by torque transmission by the shaft and pawn of the generator.
The centerline of the jet is in the same plane as the runner because the uses the dynamic force of the high pressure water stream to rotate the runner and forces the rotor to work while it is rotating.
Turbines have the advantages of dense construction, stable running and easy operation. Small turbines that are usually organized with horizontal shafts and 1-2 nozzles Normal size and larger turbines are most often organized by vertical shafts and 4 or 6 to get more force Equipped on the nozzle.

Water Turbine,Hydraulic Water Turbine,Water Turbine Generator,Water Turbine Power

Shenyang Zhicheng Heavy Machinery Manufacturing Co., Ltd. , https://www.zhichengmachinery.com