This product is a special research project established by the Ministry of Communications and the Highways Department to revise the Technical Specifications for Highway Asphalt Pavement Construction. The products specified in the “Asphalt Pavement Seepage Measurement Method and Index Requirements†are also the standard products in the new test procedures. meets the
JTJ052-2000
standard.
Pavement seepage meter
Instructions
:
1
Clean the test piece placed on a solid surface or the road surface to be tested.
2
Put the marker ring, draw the mark along the inner and outer rings with chalk, and remove the mark.
The ring also leaves an inner ring on the surface of the test piece or on the road surface.
Φ150mm
Outer ring
Φ 220mm
Two concentric circles.
3
Place the standard ring in a concentric circle and match the inner ring mark to the bottom of the standard ring
4
Check if the concentric circle has a part with a deeper construction depth, if it is necessary to seal first
The agent fills the texture depth of these parts,
To prevent water from passing through these tables during the water seepage test
The surface texture oozes, which affects the test results.
5
a thin layer of sealing material between the inner and outer marking rings and repaired into an inner diameter with a scraper
Φ150mm
Outer diameter is
Φ220mm
Thick
3mm
Ring of sealing material, should be pressed against the surface when repairing
The standard ring makes it impossible to shift.
6
Pressing the water osmometer on the sealing material to make the water permeable instrument base and the sealing material ring
Match, plus
2
Block weights to prevent pressure water from flowing between the base and the road.
7
Close the instrument valve, fill the instrument valve with water, fill it to the upper marking line
O
s position.
8
Quickly unscrew the switch and wait for the water surface to drop.
100mL
Start the ink,
Make water red
Stopwatch, every
60S
, read the water level on the measuring cylinder once, to the surface of the water
500mL
Time
until.
9
According to the above steps, select the same detection section.
5
Measuring point to determine water seepage system
number. Take the average value as the test result.
Asphalt pavement seepage meter
,
Pavement water seepage meter
,
Pavement seepage meter
,
Pavement moisture permeation instrument precautions
10
,
When filling the measuring cylinder, be careful not to collide with the measuring cylinder to prevent running water.
We have been helping customers to complete the research and development and production of various types of battery protection boards, sourcing from around the world, creating the best supply chain system, and using high-precision surface mount technology to achieve product engineering and manufacturing services for high-end and high-quality customers.
BMS,BMS Battery Board,Solar Battery Board,Solar Cell Protection Plate,Battery Board Design
Huizhou Liandajin Electronic Co., Ltd , https://www.ldjpcb.com